Certus construction case studies

rx online

Here’s a few projects we have worked on recently:

Groundworks (Click to view)

Screeding (Click to view)

Underfloor heating (Click to view)

Groundworks

Project: Endsleigh Primary School

Contractor: Rydon

Package value: 400k

Date: 2017

Brief: Complete substructures, drainage, floor slabs, structural topping, insulation and screed package. External works package to provide a new Primary School facility for the new residential development at Lansdown on the outskirts of Bath.

images

Project: Blackbrook Pool, Taunton

Brief: Provision of the complete ground-works package including: Grass-crete car parks, reinforced foundation systems, storm attenuation, Wessex Water drainage works

Main Contractor: BAM Construction

Value: £ 0.9 M

Top of page

Project: Dolphin School, Bristol

Date: 2015/2016

Brief: New foundation system including pile caps, ground beams and mass filled concrete for a new City Centre school. Drainage system including two live Wessex Water diversions and a new storm attenuation tank.

Project: Oxford Street Student Accommodation Cardiff

Date: 2015/2016

Brief: Complete substructures, drainage and external works package, including floor slabs and storm attenuation tanks.

Main Contractor: Midas Construction

Value: £ 0.9 M

 

Top of page

Screeding

Project: Lyde Green Academy Primary School, Bristol

Date: 2015/2016

Brief: Complete substructures, drainage and external works package to provide a new primary school facility for South Gloucs Council.

Main Contractor: BAM Construction

Value: £ 0.7 M

Underfloor heating