Case Studies

Here’s a few projects we have worked on recently:

Project: Lucozade Ribena Suntory factory, Coleford

Date: 2014/2015

Brief: Drainage alterations and construction of a new slab to form a new Central Engineering workshop. The design brief was for a lightweight slab, so approx 170m3 of void former was used to level up the previously sloping site, prior to casting the new slab

Project: Blackbrook Pool, Taunton

Brief: Provision of the complete ground-works package including: Grass-crete car parks, reinforced foundation systems, storm attenuation, Wessex Water drainage works

Main Contractor: BAM Construction

Value: £ 0.9 M

Project: Dolphin School, Bristol

Date: 2015/2016

Brief: New foundation system including pile caps, ground beams and mass filled concrete for a new City Centre school. Drainage system including two live Wessex Water diversions and a new storm attenuation tank.

Project: Oxford Street Student Accommodation Cardiff

Date: 2015/2016

Brief: Complete substructures, drainage and external works package, including floor slabs and storm attenuation tanks.

Main Contractor: Midas Construction

Value: £ 0.9 M

Project: Lyde Green Academy Primary School, Bristol

Date: 2015/2016

Brief: Complete substructures, drainage and external works package to provide a new primary school facility for South Gloucs Council.

Main Contractor: BAM Construction

Value: £ 0.7 M